Athlone Greenway Project

On behalf of PD Contractors, we are the civil contractor on 1.1km of the new greenway from Athlone Marina to the existing Greenway at the Ballymahon Road. Project involves a section of excavation through Abbey graveyard. Due to the location of the works, all excavation works were supervised by an archaeologist. Installation of 1km of […]

VALEO, TUAM, CO. GALWAY

As main contractor, MAHON LTD have constructed over 1000 car parking spaces in Valeo Visions factory in Tuam. Full drainage including petrol interceptors, attenuation tanks, footpaths, surfacing and white lining. Also completed various concrete works throughout the factory. Demolition and removal of internal concrete slab, installation of drainage for factory machines and reinstatement of concrete […]

Aldi Knocknacarra

Kelmin Developments were responsible for the construction of this new supermarket on a green field site. MAHON LTD supplied a project engineer to Kelmin for the duration of the project, along with plant, operators and groundworkers. All work was completed on time and to the highest of standards.

ST. Raphael’s School, Loughrea.

Full civil package for a 2000m² extension, new access roads, all drainage and finishing works. Over 12,000m³ excavated and disposed off-site. A further 14,000m³ to be cut and filled on site for a new, fully drained GAA pitch for the school. Diversion of Loughrea town watermain and scour main. Removal of asbestos water main as part of […]