As part of a Rapid Build Housing Development for ABM Design & Build, MAHON LTD were awarded the groundworks packages for 43 houses. Works started in June 2020. Under strict COVID-19 restrictions, the project is progressing well. 450m of drainage foul drainage exceeding 3.0m deep, extensive road works for ESB, disposal of over 6000m3 off-site. […]
Tullagh Hill Housing Development
Housing development for KELMIN LTD. 79 housing units on greenfield 8 acre site. Mahon LTD have been awarded full groundworks package including site development, drainage & services and all site finishes. This work is ongoing.
Colaiste Baile Chláir, Claregalway
Ongoing project for ABM Europe. January 2019 – December 2019 Groundworks Contract on two new schools. ETNS steel frame building of 1,700m2 and extension of 2,900m2 to the existing secondary school. Excavation of 9,500m3 of material, on and off-site. Pouring of over 2,000m3 of concrete.
VALEO, TUAM, CO. GALWAY
As main contractor, MAHON LTD have constructed over 1000 car parking spaces in Valeo Visions factory in Tuam. Full drainage including petrol interceptors, attenuation tanks, footpaths, surfacing and white lining. Also completed various concrete works throughout the factory. Demolition and removal of internal concrete slab, installation of drainage for factory machines and reinstatement of concrete […]
SKERRIES & SWORDS EDUCATE TOGETHER, DUBLIN
Both schools were constructed by ABM EUROPE as part of the rapid build school programme from the Department of Education. With a programme of 24 and 26 weeks from site set up to full completion, MAHON LTD had to organise and plan every aspect of the works in great detail with the main contractor to meet the deadlines. […]
DUNSHAUGHLIN COMMUNITY SCHOOL, MEATH
Full civil package for 2500m2 extension, new access roads and entrance, a GAA and soccer pitch. Over 15,000m3 moved and re-spread on site. School and community centre kept open at all times during the project. All finishing works including paths, kerbing, paving completed by MAHON LTD. Project was handed over five months ahead of schedule.
Aldi Knocknacarra
Kelmin Developments were responsible for the construction of this new supermarket on a green field site. MAHON LTD supplied a project engineer to Kelmin for the duration of the project, along with plant, operators and groundworkers. All work was completed on time and to the highest of standards.
ST. Raphael’s School, Loughrea.
Full civil package for a 2000m² extension, new access roads, all drainage and finishing works. Over 12,000m³ excavated and disposed off-site. A further 14,000m³ to be cut and filled on site for a new, fully drained GAA pitch for the school. Diversion of Loughrea town watermain and scour main. Removal of asbestos water main as part of […]
SCOIL RIABHACH, LOUGHREA, CO. GALWAY.
Works commenced on the Rapid Build Contract for ABM Europe in May 2017. The 12 classroom school is located on a green field site in Loughrea, Co. Galway. Mahon LTD have taken on the full groundworks package for the project. Works were finished by late October 2017. All material was kept and landscaped on site.