Full civil package for 2500m2 extension, new access roads and entrance, a GAA and soccer pitch. Over 15,000m3 moved and re-spread on site. School and community centre kept open at all times during the project. All finishing works including paths, kerbing, paving completed by MAHON LTD. Project was handed over five months ahead of schedule.
Aldi Knocknacarra
Kelmin Developments were responsible for the construction of this new supermarket on a green field site. MAHON LTD supplied a project engineer to Kelmin for the duration of the project, along with plant, operators and groundworkers. All work was completed on time and to the highest of standards.
ST. Raphael’s School, Loughrea.
Full civil package for a 2000m² extension, new access roads, all drainage and finishing works. Over 12,000m³ excavated and disposed off-site. A further 14,000m³ to be cut and filled on site for a new, fully drained GAA pitch for the school. Diversion of Loughrea town watermain and scour main. Removal of asbestos water main as part of […]
SCOIL RIABHACH, LOUGHREA, CO. GALWAY.
Works commenced on the Rapid Build Contract for ABM Europe in May 2017. The 12 classroom school is located on a green field site in Loughrea, Co. Galway. Mahon LTD have taken on the full groundworks package for the project. Works were finished by late October 2017. All material was kept and landscaped on site.